Matched workload · electrical gain
One grid connection. Two outcomes.
A schematic of the same utility power budget. Moving dots explain the sequence; they do not represent measured electrons or tokens.
The utility connection caps how much power this campus can draw.
A gradual change in the installed fleet.
External-sales IT capacity, end of year. New installations and retrofits accumulate; existing cohorts retire at 2% per year.
External-sales share is an analyst assumption applied uniformly to all architecture cohorts. This chart is a scenario, not a disclosed inventory of 800 V projects.
Capacity is an option. Sales make it valuable.
| Annual unless noted | AC reference | DC · same sales | DC · expand |
|---|
Surplus = revenue less modeled delivery costs, including capital recovery. It is neither EBITDA nor net income. Software, sales, corporate costs and taxes are excluded. Constant 2026 dollars.