Prediction markets + evaluation / Evaluation design
What an AI forecasting benchmark proves—and what it leaves open
Separate retrospective answer accuracy from forecasting skill, calibration, market comparison, and executable trading performance.
The answer
A historical question-answering benchmark can measure agreement with resolved outcomes, but it cannot by itself establish forecasting skill or trading profitability. A credible forecast evaluation needs predictions timestamped before the relevant information and outcomes became available.
Start with the limitation in my own benchmark
My GJOpen comparison of D1 and Jev evaluated 1,005 resolved yes/no questions. It reports model probabilities, Brier scores, and question-level answers. That makes the test inspectable, but it remains a retrospective answer evaluation.
The models received question text without the recorded outcomes. That does not ensure the outcomes were absent from their training data or other prior knowledge. The page explicitly states this limitation. A lower score in that experiment should not be described as evidence that the model could have predicted those events in real time.
For a product team, this distinction determines what can be claimed. A historical result can motivate a forward evaluation or reveal error patterns. It cannot validate a live trading strategy without additional evidence.
Score the probabilities, then inspect calibration
For binary events, the Brier score is the mean squared difference between the assigned probability and the outcome, encoded as zero or one. The scikit-learn documentation gives the definition and implementation details.
Binary Brier score = mean((P(Yes) − outcome)²)
A hypothetical 70% prediction receives a score of 0.09 when the event occurs and 0.49 when it does not. A constant 50% prediction scores 0.25 on every binary event. That is a useful reference, but an informative base-rate predictor can do better in an imbalanced dataset.
A single average is insufficient. I would inspect calibration by probability band, event category, time horizon, and information availability. If events assigned around 70% occur far less often, the model's confidence is commercially relevant even when threshold accuracy looks acceptable.
Small bins are noisy, and related events can make a dataset look larger than its effective independent sample. Report counts, uncertainty, and the grouping policy. Do not tune a calibrator on the same observations used to report its final performance.
A prospective test has to freeze the information set
| Record | Why it matters |
|---|---|
| Event ID and exact resolution rule | Similar event wording can refer to different outcomes |
| Prediction time and horizon | Proves the forecast preceded resolution and later information |
| Model, prompt, tools, and source snapshot | Makes the permitted information set inspectable |
| Probability and abstention state | Prevents dropping difficult or failed requests after the fact |
| Contemporaneous baseline | Compares against base rates, humans, or market information available then |
| Resolution time and adjudication | Separates delayed or disputed outcomes from model errors |
I would predefine event inclusion, repeated-forecast handling, missing-data policy, and the scoring window. If a model can read market prices, compare it with those same contemporaneous prices; otherwise an apparent modeling advantage may simply reflect access to a strong baseline.
For an integration prototype, Kalshi documents public market-data endpoints. A useful read-only demo would retain event identifiers and timestamps, flag stale data, and preserve the resolution terms with the observation. That is a proposed extension, not a feature already shipped in the benchmark.
A probability estimate is not an executable trade
A model can be better calibrated and still offer no profitable execution opportunity. Displayed prices, available order-book depth, spread, fees, fill probability, and the timing of an order affect the actual result.
As a synthetic arithmetic example, suppose a model assigns a 60% probability to a contract paying $1 on Yes and $0 otherwise. If buying costs $0.58 plus $0.03 in total execution costs per contract, its modeled expected net payoff is $0.60 − $0.58 − $0.03 = −$0.01. The example assumes the probability is correct and the order fills; neither condition is established by a historical benchmark.
Kalshi's fee guidance and Polymarket's fee documentation describe venue-specific structures and exceptions. A serious evaluation must use the applicable market's terms and the schedule effective at the observation time, rather than one universal fee assumption.
What I would build next
The next useful artifact is a prospective forecast ledger with timestamped inputs, frozen predictions, and a comparison with contemporaneous baselines. A small read-only interface could show calibration, missing observations, resolution changes, and confidence intervals.
For a prediction-market product, I would also test whether users understand the resolution rule and their actual exposure. A sophisticated forecast is less useful if the interface makes the contract easy to misunderstand.
The transferable skill is disciplined measurement: make the information set explicit, separate model quality from execution, and let the evidence determine the claim. The existing project demonstrates retrospective evaluation work; prospective forecasting and live performance remain untested.
About this piece: an independent analytical framework with original worked examples. Numerical examples are synthetic unless explicitly identified as measured results. Sources were checked on October 29, 2026; product documentation and commercial terms can change.